National Aquatic Centre

Australia's new home for aquatic sport is being built for the Brisbane 2032 Olympic and Paralympic Games, and designed to outlast them by generations. The inclusive, intergenerational and distinctly Brisbane venue begins with a single idea: the first splash.
Project Details
- Traditional Owners:
- Turrbal and Yuggera
- Client:
- Games Independent Infrastructure and Coordination Authority
- Completion:
- 2032
- Principal Architects:
- ARM Architecture, Arkhefield, NH Architecture
- Key People:
Andrew Hayne, Neil Masterton, Howard Raggatt, Aaron Poupard, Lucy Carruthers
“This is the place where dreams will be realised and history made.”


“Athlete experience is at the centre of this pool design. It’s engineered for athletes to perform at their best and inspire the nation. After the Games it’s a high-performance training facility for our next generation of champions.”



